Solminer = Low IQ crypto bro scammers
I would urge anyone considering Solminer’s Kentucky mining property to independently verify the advertised power pricing, available capacity, and site readiness before relying on any marketing claims.
In my experience, the advertised 5.5¢ “all-in” power pricing is not supported by the actual utility structure and should not be treated as a reliable operating assumption for a mining investment. The claimed 2 MW capacity should also be treated with caution. Based on the site conditions, infrastructure, and operating limitations I observed, I do not believe the property has the practical 2 MW mining capacity being promoted.
The design quality and airflow concept also raised concerns for a property marketed as a turnkey mining operation.
Before committing funds, verify the tariff directly with the utility, confirm usable continuous load with an independent electrical professional, and do not rely on generalized claims regarding pricing, uptime, capacity, or readiness.
My recommendation: proceed carefully and verify everything independently.
14 janvier 2026
Avis spontané